How Long Does Hardwood Floor Refinishing Take?
I'm Cristobal, and I refinish hardwood floors all over metro Atlanta. The question I hear the most after "what color should I pick" is how long the house will be out of order. For a normal job of a few rooms, plan on 3 to 5 days of work, then a few more days before the rugs go back down. Here is what happens each day and what can make it longer.
Day by day on a typical job
Day 1: Prep and sanding. I cover vents and doorways and run the sander with a vacuum attached. I sand to bare wood in three passes, coarse, medium and fine, then edge along the walls and hand-scrape the corners. A living room, dining room and hallway usually take one full day.
Day 2: Repairs, stain samples and stain. I fill gaps and nail holes and replace any damaged boards. Then I put stain samples right on your floor so you can pick the color in your own light. Once you choose, I apply the stain. Stain needs to dry overnight before any finish goes on, longer on a humid day.
Days 3 to 4: Finish coats. I put down three coats of polyurethane and buff lightly between coats. With water-based finish I can often do two coats in one day. Oil-based finish usually means one coat per day.
Day 5: Stairs or extra rooms. Stairs are slow because every tread and riser is sanded by hand. A full staircase can add a day by itself.
When you can walk, move furniture and put rugs back
- Socks only: about 24 hours after the last coat of water-based finish, about 48 hours after oil-based.
- Furniture back: about 2 to 3 days for water-based, 4 or more days for oil-based. Lift it, never drag it, and put felt pads on every leg.
- Rugs back: wait 2 to 3 weeks. The finish keeps curing under the surface, and a rug too early can leave marks.
What makes it take longer in Georgia
Humidity. Atlanta summers are wet, and finish dries slower when the air is heavy. In July and August I plan an extra day for an oil-based job. Running the AC during and after the work helps a lot.
Cupped boards. Many homes in Decatur, Marietta and Roswell sit over crawlspaces. If the boards are cupped from moisture, I may ask you to fix the crawlspace and wait before I sand, so the floor dries flat first.
Dark stain. Dark colors like Jacobean or Ebony need more drying time before the first coat, and I'm extra careful with the final sanding so no swirl marks show.
Repairs and pet stains. Replacing boards, weaving in new wood where a wall came out, or cutting out deep pet stains adds time.
Big or open floor plans. Open layouts have to be done all at once so there are no lap lines, which means the whole area is off-limits at the same time.
Can you stay home during the work?
Often yes, if the work is on one floor and you can live on another. With oil-based finish, most families leave for a night or two because of the smell. Water-based finish has much less odor and dries faster, which is why many of my clients pick it.
Common questions
Can you refinish one room in one day?
A single small room can be sanded and stained in one day, but the finish coats still need another day or two to go on and dry.
Is a screen and recoat faster?
Yes. If the floor only has light scratches and no bare wood showing, a screen and recoat is usually done in one day, with light use the next day.
Does the time of year matter?
Yes. Spring and fall are the easiest months in Atlanta because humidity is moderate. Summer jobs work fine, they just need more dry time and the AC running.
How do I know how long my job will take?
Text me photos of your floors, the square footage and if there are stairs, and I'll tell you how many days your job needs.